On 2006-01-26, Al Nikolov <al@iac.spb.ru> wrote: > I assumed though that ITP should be closed after that the package was become > ready and was appeared in the pool. I'm i wrong? It should be closed in the changelog. Then it will automagically be closed when package get build. /Sune Vice President of packaging kommando