Re: On cadence and collaboration
Luk Claes wrote:
> If the freeze date is well known in advance the question becomes moot
> unless some maintainer wants to work against the freeze AFAICS. Having a
> known freeze date is meant to help everyone to be able to plan better
> and refrain from doing high impact changes right before the freeze.
There is nothing bad with a fixed freeze date. Just with the way it was planned
for December.
--
Bernd Zeimetz Debian GNU/Linux Developer
GPG Fingerprints: 06C8 C9A2 EAAD E37E 5B2C BE93 067A AD04 C93B FF79
ECA1 E3F2 8E11 2432 D485 DD95 EB36 171A 6FF9 435F
Reply to: