Hi, On Wed, 2004-01-14 at 15:58, Robert Jordens wrote: > During the 0-day-NMU phase this was not needed. Failure to satisfy > build-dependencies in unstable is release-critical. We can do regular > NMUs after waiting for lets say a week and then we can do 1-week-delayed > uploads (I hope we can since auric is not shell-accessible). That should > cut down the time to about 3 weeks. Remember that according to the RM, until the sarge release, every weekend is considered a bug squashing party. bye, Roland
Attachment:
signature.asc
Description: This is a digitally signed message part