[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

11.7 planning



Hi,

We're overdue for 11.7 and need it done with a keyring update included
before bookworm can be released. The wheels are turning on the keyring so
how do dates in April look for everybody? Saturdays are 1st (probably too
soon), 8th, 15th, 22nd and 29th.

Thanks,

-- 
Jonathan Wiltshire                                      jmw@debian.org
Debian Developer                         http://people.debian.org/~jmw

4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC  74C3 5394 479D D352 4C51
ed25519/0x196418AAEB74C8A1: CA619D65A72A7BADFC96D280196418AAEB74C8A1

Attachment: signature.asc
Description: PGP signature


Reply to: