Colleagues, Apparently my 2s and 3s are all backwards. In February, we have three data centre outages and one machine move: 2013-02-17T18:00Z/24:00Z [1]: ubcece outage for firmware update as previously announced in [5] but now with confirmed times; DSA-controlled 2013-02-17T10:00Z [10]: moving master.debian.org to a new virtual machine as previously announced in [9]; DSA-controlled 2013-02-22T11:00Z/19:00Z [2]: man-da outage for re-racking as previously announced in [6]; DSA-controlled 2013-02-24T15:00Z/18:00Z [7]: ubcece outage for network debugging as previously announced in [5] but with different date (24rd, not 16th); upstream-controlled In March, we have one data centre outage (so far): 2013-03-24T07:00Z/15:00Z [8]: man-da outage for power feed [NEW] as announced by man-da recently to DSA; local power operator is upgrading a transformer; same set of services impacted as listed in [6]; upstream-controlled Thanks, Luca for Debian System Administration Team [1] check time in your locale http://tinyurl.com/ak843yd [2] check time in your locale http://tinyurl.com/a23oa55 [5] http://lists.debian.org/debian-infrastructure-announce/2013/02/msg00000.html [6] http://lists.debian.org/debian-infrastructure-announce/2013/02/msg00002.html [7] check time in your locale http://tinyurl.com/btlo3kf [8] check time in your locale http://tinyurl.com/cb3wxv2 [9] https://lists.debian.org/debian-infrastructure-announce/2013/02/msg00001.html [10] check time in your locale http://tinyurl.com/cjouplo On Thu, Feb 14, 2013 at 11:23:14PM +0000, Luca Filipozzi wrote: > There are four upcoming scheduled outages that will have not insignificant > impact on Debian infrastructure. These outages are: -- Luca Filipozzi http://www.crowdrise.com/SupportDebian
Attachment:
signature.asc
Description: Digital signature