Colleagues, There are four upcoming scheduled outages that will have not insignificant impact on Debian infrastructure. These outages are: 2012-03-17T18:00Z/24:00Z [1]: ubcece outage for firmware update as previously announced in [5] but now with confirmed times; DSA-controlled 2012-03-22T11:00Z/19:00Z [2]: man-da outage for re-racking as previously announced in [6]; DSA-controlled 2012-03-24T07:00Z/15:00Z [3]: man-da outage for power feed [NEW] as announced by man-da recently to DSA; local power operator is upgrading a transformer; same set of services impacted as listed in [6]; upstream-controlled 2012-03-24T15:00Z/18:00Z [4]: ubcece outage for network debugging as previously announced in [5] but with different date (24rd, not 16th); upstream-controlled Almost all service at these locations will be unavailable during the duration of the outages. Given that [4] begins when [3] ends, there may be an overlap when both ubcece and man-da are unavailable. Thanks, Luca for Debian System Administration Team [1] check time in your locale http://tinyurl.com/ak843yd [2] check time in your locale http://tinyurl.com/a23oa55 [3] check time in your loacle http://tinyurl.com/ak4tsze [4] check time in your locale http://tinyurl.com/a54calt [5] http://lists.debian.org/debian-infrastructure-announce/2013/02/msg00000.html [6] http://lists.debian.org/debian-infrastructure-announce/2013/02/msg00002.html -- Luca Filipozzi http://www.crowdrise.com/SupportDebian
Attachment:
signature.asc
Description: Digital signature