[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

Re: 11.7 planning



29th is workable.

On 3/15/23 18:36, Andy wrote:
On 15 March 2023 20:33:47 GMT, Jonathan Wiltshire <jmw@debian.org> wrote:
Hi,

We're overdue for 11.7 and need it done with a keyring update included
before bookworm can be released. The wheels are turning on the keyring so
how do dates in April look for everybody? Saturdays are 1st (probably too
soon), 8th, 15th, 22nd and 29th.

Thanks,



I can do 15th, 22nd or 29th
Isy is only available from the 29th (mocks)

Best wishes
/Andy

--



Be well,

-Donald

--
-
⢀⣴⠾⠻⢶⣦⠀
⣾⠁⢠⠒⠀⣿⡁ Donald Norwood
⢿⡄⠘⠷⠚⠋⠀ B7A1 5F45 5B28 7F38 4174
⠈⠳⣄⠀⠀⠀⠀ D5E9 E5EC 4AC9 BD62 7B05


Reply to: