[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

Re: Scheduling 9.5



Adam D. Barratt <adam@adam-barratt.org.uk> (2018-07-11):
> All of the builds were accepted in time for the 13:52 dinstall, so
> everything should be in place for the dini upload.

Right, I had seen the successful builds earlier but dinstall was missing
still; I've verified the build goes fine, included the patches for
#902226, opened #903618 to keep track we could be even better there, and
proceeded to a source upload.

Please let me know if there's anything else I can help you with.


Cheers,
-- 
Cyril Brulebois (kibi@debian.org)            <https://debamax.com/>
D-I release manager -- Release team member -- Freelance Consultant

Attachment: signature.asc
Description: PGP signature


Reply to: