[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

Re: Scheduling 9.5



On Wed, 2018-06-27 at 20:16 +0100, Adam D. Barratt wrote:
> [Sorry, this got stuck in drafts]
> 
> On Mon, 2018-06-25 at 22:06 +0200, Cyril Brulebois wrote:
> > Adam D. Barratt <adam@adam-barratt.org.uk> (2018-06-25):
> > > After some discussion on IRC, we've decided to go with the 14th
> > > and
> > > look at making the press side more handleable for that date.
> > 
> > So freezing on the 7st as customary?
> 
> Yep.

As with 8.11, there's been a kernel ABI bump for stretch since 9.4, so
we'll need a source d-i upload in order to accommodate that.

All of the expected uploads that are relevant for d-i are already in
place, so please feel free to upload at a convenient time. Please let
us know if there's anything we can do to assist.

Thanks,

Adam


Reply to: