[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

Re: [Oldenburg] topics for today's meeting



Kenshi Muto wrote:
> At 25 Sep 04 04:16:56 GMT,
> Joey Hess wrote:
> > We're having a meeting today in Oldenburg at 1 pm to talk about both
> > immediate release plans and post-sarge d-i stuff. This is just a draft
> > of some things we might want to cover at the meeting.
> > 
> > Release plans:
> > 
> > 	Come up with a draft release timeline, based on this one:
> >         29 Sep last day for udeb changes for tc2
> > 	       udebs propigated to testing (rc1 breaks)
> > 	30 Sep release tc2 (or give up on the idea)
> > 	       string freeze begins
> > 	 7 Oct translation uploads
> > 	       last day to upload fixes to packages on initrds
> > 	 8 Oct initrd builds start for rc2
> > 	21 Oct initrd builds finish (or earlier..)
> >                last day for uploads of any udebs or debs for rc2
> > 	22 Oct udebs propigated to testing (tc1 breaks)
> > 	       full debian freeze probably starts here
> > 	       final CD builds
> > 	23 Oct testing begins
> > 	29 Oct web site updates
> > 	       and rc2 release
> 
> Well, from "Subject: Release update: Qt, arts, arm, yes; freeze date,
> no" by Steve:
> 
> >   N+16 days
> >   90 RC bugs
> >   d-i RC2
> >   Freeze time!
> > 
> > A release candidate of d-i will require about three weeks to prepare, so
> > preparations will need to begin before testing-security is fully
> > operational to meet this timeline.  Because this process has not started
> > yet, and because of the Oldenburg conference that will keep many of our
> > installer team busy, this gives us a date for "N" of at least two weeks
> > out from today.
> > 
> > If all goes well, for both RC bug fixes and the d-i RC2 release, we'll
> > be ready to freeze the rest of the archive at this point.  Changes to
> > base+standard are limited to RC fixes only; fixes for RC bugs and
> > translation updates are allowed for the rest of the archive via
> > testing-proposed-updates.
> > 
> > 
> >   N+30 days
> >   0 RC bugs
> 
> Hmm, Joey's plan breaks Steve's initial plan something? (at least RC2
> release date and full freeze date)
> 
> Do we need to have more test time after release RC2? Or RC2 release is
> really final version and release full Sarge at same time or soon
> later? (although this is RM's decision)

No, we need testing time before declaring rc2 final, not afterwards. If we find
RC bugs in d-i after rc2, they will be treated the same as other RC bugs found
in other packages after the full freeze begins.

Steve's plan does not define N, but sets a minimum value of N for
October 6th. My plan makes the minimum value of N be October 15th, but
as far as I can see, does not conflict with Steve's plan otherwise.

Anyway, we'll have the other RM at the meeting, so we can refine
this more then and discuss it on list afterwards.

-- 
see shy jo

Attachment: signature.asc
Description: Digital signature


Reply to: