Hi, I surveyed the venue last Thursday, took some photos of the equipments, and uploaded to Sandstorm: https://storm.debian.net/grain/6u7kM469itPrFtqWXrnJkB/#2 There are several notes I'd like to take: The venue provides mixers and wireless microphones: Int'l Room Mixer: RAMSA WR-S4416 Room 4 Mixer: YAMAHA MG166c Spare mixer: Spirit Folio SX Room 1 has no mixer, but we can use the spare one for it. Int'l room mixer has hissing sound, probably due to bad grounding? We can probably change the cabling of the cables, but we have to restore to their original state at the end of the event. Wireless Mic Receiver: TOA WT-1824 Int'l and Room 4 has 2 Room 1 has 1 Wireless Mic: TOA WM-1220 Wearing Mic: didn't check, supposed to be WM-1320 Each room should have at least 2 of wireless mics and 2 of wearing mics. If there's no sufficient mic we have, we can take mics from other classrooms. Projectors: Epson EB-G5100 to EB-G5510 Int'l has 3 (left, center, right) Room 4 and Room 1 has 1 These are 7000 lux, has 1024x768 resolution, and has HDMI input. Currently the venue only uses VGA as input, but they planned to add the HDMI cable to the projectors for Int'l Room (only). We can route the HDMI cable to the projector as long as we restore the cabling at the end of the event. About the ethernet cabling, Room 4 and Room 1 has 2 ethernet plugs, where one of each two has been routed to the podium using extra cabling from the back (removable). I didn't spot how many ethernet jacks Int'l have. The IT manager says it is okay to separate some of the ports to the different VLANs as long as the rooms applying them is under our rental. Talking about the rent, we probably need to change our rent of conference rooms from July 26 instead of July 28 since Video team prefers having 3 days before open day for preparation. Yao Wei
Attachment:
signature.asc
Description: Message signed with OpenPGP