Problem with growisofs: CLOSE SESSION failed with SK=5h/ASC=72h/ACQ=03h



Hello everyone.
I got a LG GSA-4160B a few weeks ago, and have been recording DVD-Rs with growisofs since then. I haven't had any problems until yesterday. Googled it for a couple of hours but couldnt find much about it. This happened in 2 out of 4 recordings (the second and forth ones) that I tried yesterday.

My system is a Debian GNU/Linux running kernel 2.6.8-2-k7. Packages are up-to-date with the testing distribution. Here's growisofs version:

---start---

$ growisofs -version
* growisofs by <appro@fy.chalmers.se>, version 5.21,
  front-ending to mkisofs: mkisofs 2.01-unofficial-iconv (i686-pc-linux-gnu)

---end---

Here's growisofs' output:

---start---

$ growisofs -Z /dev/scd1 -R -J dvd/
Executing 'mkisofs -R -J dvd/ | builtin_dd of=/dev/scd1 obs=32k seek=0'
INFO:   ISO-8859-1 character encoding detected by locale settings.
        Assuming ISO-8859-1 encoded filenames on source filesystem,
        use -input-charset to override.

<stuff about filenames>

/dev/scd1: "Current Write Speed" is 4.1x1385KBps.
  0.23% done, estimate finish Fri Apr 29 19:49:01 2005
  0.46% done, estimate finish Fri Apr 29 19:16:38 2005
  0.69% done, estimate finish Fri Apr 29 19:03:23 2005
  0.92% done, estimate finish Fri Apr 29 18:58:35 2005
  1.15% done, estimate finish Fri Apr 29 18:55:41 2005
  1.38% done, estimate finish Fri Apr 29 18:53:45 2005
  1.61% done, estimate finish Fri Apr 29 18:52:23 2005
  1.84% done, estimate finish Fri Apr 29 18:51:21 2005
  2.08% done, estimate finish Fri Apr 29 18:50:32 2005
  2.31% done, estimate finish Fri Apr 29 18:49:11 2005
  2.54% done, estimate finish Fri Apr 29 18:48:43 2005
  2.77% done, estimate finish Fri Apr 29 18:48:20 2005
  3.00% done, estimate finish Fri Apr 29 18:48:01 2005
  3.23% done, estimate finish Fri Apr 29 18:47:44 2005
  3.46% done, estimate finish Fri Apr 29 18:47:29 2005
  3.69% done, estimate finish Fri Apr 29 18:47:17 2005
  3.92% done, estimate finish Fri Apr 29 18:46:40 2005
  4.15% done, estimate finish Fri Apr 29 18:46:32 2005
  4.38% done, estimate finish Fri Apr 29 18:46:24 2005
  4.61% done, estimate finish Fri Apr 29 18:46:17 2005
  4.84% done, estimate finish Fri Apr 29 18:46:11 2005
  5.07% done, estimate finish Fri Apr 29 18:46:05 2005
  5.30% done, estimate finish Fri Apr 29 18:45:41 2005
  5.53% done, estimate finish Fri Apr 29 18:45:37 2005
  5.76% done, estimate finish Fri Apr 29 18:45:34 2005
  5.99% done, estimate finish Fri Apr 29 18:45:30 2005
  6.22% done, estimate finish Fri Apr 29 18:45:27 2005
  6.45% done, estimate finish Fri Apr 29 18:45:25 2005
  6.69% done, estimate finish Fri Apr 29 18:45:22 2005
  6.92% done, estimate finish Fri Apr 29 18:45:05 2005
  7.15% done, estimate finish Fri Apr 29 18:45:03 2005
  7.38% done, estimate finish Fri Apr 29 18:45:01 2005
  7.61% done, estimate finish Fri Apr 29 18:45:00 2005
  7.84% done, estimate finish Fri Apr 29 18:44:58 2005
  8.07% done, estimate finish Fri Apr 29 18:44:57 2005
  8.30% done, estimate finish Fri Apr 29 18:44:55 2005
  8.53% done, estimate finish Fri Apr 29 18:44:42 2005
  8.76% done, estimate finish Fri Apr 29 18:44:53 2005
  8.99% done, estimate finish Fri Apr 29 18:44:52 2005
  9.22% done, estimate finish Fri Apr 29 18:44:50 2005
  9.45% done, estimate finish Fri Apr 29 18:44:49 2005
  9.68% done, estimate finish Fri Apr 29 18:44:48 2005
  9.91% done, estimate finish Fri Apr 29 18:44:47 2005
 10.14% done, estimate finish Fri Apr 29 18:44:47 2005
 10.37% done, estimate finish Fri Apr 29 18:44:46 2005
 10.60% done, estimate finish Fri Apr 29 18:44:35 2005
 10.83% done, estimate finish Fri Apr 29 18:44:35 2005
 11.07% done, estimate finish Fri Apr 29 18:44:34 2005
 11.30% done, estimate finish Fri Apr 29 18:44:34 2005
 11.53% done, estimate finish Fri Apr 29 18:44:33 2005
 11.76% done, estimate finish Fri Apr 29 18:44:33 2005
 11.99% done, estimate finish Fri Apr 29 18:44:32 2005
 12.22% done, estimate finish Fri Apr 29 18:44:23 2005
 12.45% done, estimate finish Fri Apr 29 18:44:23 2005
 12.68% done, estimate finish Fri Apr 29 18:44:31 2005
 12.91% done, estimate finish Fri Apr 29 18:44:30 2005
 13.14% done, estimate finish Fri Apr 29 18:44:22 2005
 13.37% done, estimate finish Fri Apr 29 18:44:22 2005
 13.60% done, estimate finish Fri Apr 29 18:44:22 2005
 13.83% done, estimate finish Fri Apr 29 18:44:22 2005
 14.06% done, estimate finish Fri Apr 29 18:44:21 2005
 14.29% done, estimate finish Fri Apr 29 18:44:21 2005
 14.52% done, estimate finish Fri Apr 29 18:44:21 2005
 14.75% done, estimate finish Fri Apr 29 18:44:14 2005
 14.98% done, estimate finish Fri Apr 29 18:44:14 2005
 15.21% done, estimate finish Fri Apr 29 18:44:14 2005
 15.44% done, estimate finish Fri Apr 29 18:44:14 2005
 15.68% done, estimate finish Fri Apr 29 18:44:13 2005
 15.91% done, estimate finish Fri Apr 29 18:44:13 2005
 16.14% done, estimate finish Fri Apr 29 18:44:13 2005
 16.37% done, estimate finish Fri Apr 29 18:44:07 2005
 16.60% done, estimate finish Fri Apr 29 18:44:07 2005
 16.83% done, estimate finish Fri Apr 29 18:44:07 2005
 17.06% done, estimate finish Fri Apr 29 18:44:07 2005
 17.29% done, estimate finish Fri Apr 29 18:44:07 2005
 17.52% done, estimate finish Fri Apr 29 18:44:07 2005
 17.75% done, estimate finish Fri Apr 29 18:44:02 2005
 17.98% done, estimate finish Fri Apr 29 18:44:02 2005
 18.21% done, estimate finish Fri Apr 29 18:44:02 2005
 18.44% done, estimate finish Fri Apr 29 18:44:02 2005
 18.67% done, estimate finish Fri Apr 29 18:44:02 2005
 18.90% done, estimate finish Fri Apr 29 18:44:02 2005
 19.13% done, estimate finish Fri Apr 29 18:44:02 2005
 19.36% done, estimate finish Fri Apr 29 18:43:57 2005
 19.59% done, estimate finish Fri Apr 29 18:43:57 2005
 19.82% done, estimate finish Fri Apr 29 18:43:57 2005
 20.05% done, estimate finish Fri Apr 29 18:43:57 2005
 20.29% done, estimate finish Fri Apr 29 18:43:57 2005
 20.52% done, estimate finish Fri Apr 29 18:43:57 2005
 20.75% done, estimate finish Fri Apr 29 18:43:53 2005
 20.98% done, estimate finish Fri Apr 29 18:43:53 2005
 21.21% done, estimate finish Fri Apr 29 18:43:53 2005
 21.44% done, estimate finish Fri Apr 29 18:43:53 2005
 21.67% done, estimate finish Fri Apr 29 18:43:53 2005
 21.90% done, estimate finish Fri Apr 29 18:43:53 2005
 22.13% done, estimate finish Fri Apr 29 18:43:54 2005
 22.36% done, estimate finish Fri Apr 29 18:43:49 2005
 22.59% done, estimate finish Fri Apr 29 18:43:49 2005
 22.82% done, estimate finish Fri Apr 29 18:43:50 2005
 23.05% done, estimate finish Fri Apr 29 18:43:50 2005
 23.28% done, estimate finish Fri Apr 29 18:43:50 2005
 23.51% done, estimate finish Fri Apr 29 18:43:50 2005
 23.74% done, estimate finish Fri Apr 29 18:43:50 2005
 23.97% done, estimate finish Fri Apr 29 18:43:46 2005
 24.20% done, estimate finish Fri Apr 29 18:43:46 2005
 24.43% done, estimate finish Fri Apr 29 18:43:47 2005
 24.66% done, estimate finish Fri Apr 29 18:43:47 2005
 24.90% done, estimate finish Fri Apr 29 18:43:47 2005
 25.13% done, estimate finish Fri Apr 29 18:43:47 2005
 25.36% done, estimate finish Fri Apr 29 18:43:43 2005
 25.59% done, estimate finish Fri Apr 29 18:43:44 2005
 25.82% done, estimate finish Fri Apr 29 18:43:44 2005
 26.05% done, estimate finish Fri Apr 29 18:43:44 2005
 26.28% done, estimate finish Fri Apr 29 18:43:44 2005
 26.51% done, estimate finish Fri Apr 29 18:43:44 2005
 26.74% done, estimate finish Fri Apr 29 18:43:45 2005
 26.97% done, estimate finish Fri Apr 29 18:43:41 2005
 27.20% done, estimate finish Fri Apr 29 18:43:41 2005
 27.43% done, estimate finish Fri Apr 29 18:43:42 2005
 27.66% done, estimate finish Fri Apr 29 18:43:42 2005
 27.89% done, estimate finish Fri Apr 29 18:43:42 2005
 28.12% done, estimate finish Fri Apr 29 18:43:42 2005
 28.35% done, estimate finish Fri Apr 29 18:43:39 2005
 28.58% done, estimate finish Fri Apr 29 18:43:39 2005
 28.81% done, estimate finish Fri Apr 29 18:43:39 2005
 29.04% done, estimate finish Fri Apr 29 18:43:40 2005
 29.28% done, estimate finish Fri Apr 29 18:43:40 2005
 29.51% done, estimate finish Fri Apr 29 18:43:40 2005
 29.74% done, estimate finish Fri Apr 29 18:43:40 2005
 29.97% done, estimate finish Fri Apr 29 18:43:37 2005
 30.20% done, estimate finish Fri Apr 29 18:43:37 2005
 30.43% done, estimate finish Fri Apr 29 18:43:38 2005
 30.66% done, estimate finish Fri Apr 29 18:43:38 2005
 30.89% done, estimate finish Fri Apr 29 18:43:38 2005
 31.12% done, estimate finish Fri Apr 29 18:43:38 2005
 31.35% done, estimate finish Fri Apr 29 18:43:38 2005
 31.58% done, estimate finish Fri Apr 29 18:43:35 2005
 31.81% done, estimate finish Fri Apr 29 18:43:36 2005
 32.04% done, estimate finish Fri Apr 29 18:43:36 2005
 32.27% done, estimate finish Fri Apr 29 18:43:36 2005
 32.50% done, estimate finish Fri Apr 29 18:43:36 2005
 32.73% done, estimate finish Fri Apr 29 18:43:37 2005
 32.96% done, estimate finish Fri Apr 29 18:43:34 2005
 33.19% done, estimate finish Fri Apr 29 18:43:34 2005
 33.42% done, estimate finish Fri Apr 29 18:43:34 2005
 33.66% done, estimate finish Fri Apr 29 18:43:34 2005
 33.89% done, estimate finish Fri Apr 29 18:43:35 2005
 34.12% done, estimate finish Fri Apr 29 18:43:35 2005
 34.35% done, estimate finish Fri Apr 29 18:43:35 2005
 34.58% done, estimate finish Fri Apr 29 18:43:32 2005
 34.81% done, estimate finish Fri Apr 29 18:43:33 2005
 35.04% done, estimate finish Fri Apr 29 18:43:33 2005
 35.27% done, estimate finish Fri Apr 29 18:43:33 2005
 35.50% done, estimate finish Fri Apr 29 18:43:33 2005
 35.73% done, estimate finish Fri Apr 29 18:43:34 2005
 35.96% done, estimate finish Fri Apr 29 18:43:31 2005
 36.19% done, estimate finish Fri Apr 29 18:43:31 2005
 36.42% done, estimate finish Fri Apr 29 18:43:31 2005
 36.65% done, estimate finish Fri Apr 29 18:43:32 2005
 36.88% done, estimate finish Fri Apr 29 18:43:32 2005
 37.11% done, estimate finish Fri Apr 29 18:43:32 2005
 37.34% done, estimate finish Fri Apr 29 18:43:32 2005
 37.57% done, estimate finish Fri Apr 29 18:43:30 2005
 37.80% done, estimate finish Fri Apr 29 18:43:30 2005
 38.03% done, estimate finish Fri Apr 29 18:43:30 2005
 38.27% done, estimate finish Fri Apr 29 18:43:31 2005
 38.50% done, estimate finish Fri Apr 29 18:43:31 2005
 38.73% done, estimate finish Fri Apr 29 18:43:31 2005
 38.96% done, estimate finish Fri Apr 29 18:43:29 2005
 39.19% done, estimate finish Fri Apr 29 18:43:29 2005
 39.42% done, estimate finish Fri Apr 29 18:43:29 2005
 39.65% done, estimate finish Fri Apr 29 18:43:29 2005
 39.88% done, estimate finish Fri Apr 29 18:43:30 2005
 40.11% done, estimate finish Fri Apr 29 18:43:30 2005
 40.34% done, estimate finish Fri Apr 29 18:43:30 2005
 40.57% done, estimate finish Fri Apr 29 18:43:28 2005
 40.80% done, estimate finish Fri Apr 29 18:43:28 2005
 41.03% done, estimate finish Fri Apr 29 18:43:28 2005
 41.26% done, estimate finish Fri Apr 29 18:43:28 2005
 41.49% done, estimate finish Fri Apr 29 18:43:29 2005
 41.72% done, estimate finish Fri Apr 29 18:43:29 2005
 41.95% done, estimate finish Fri Apr 29 18:43:29 2005
 42.18% done, estimate finish Fri Apr 29 18:43:27 2005
 42.41% done, estimate finish Fri Apr 29 18:43:27 2005
 42.64% done, estimate finish Fri Apr 29 18:43:27 2005
 42.88% done, estimate finish Fri Apr 29 18:43:27 2005
 43.11% done, estimate finish Fri Apr 29 18:43:28 2005
 43.34% done, estimate finish Fri Apr 29 18:43:28 2005
 43.57% done, estimate finish Fri Apr 29 18:43:26 2005
 43.80% done, estimate finish Fri Apr 29 18:43:26 2005
 44.03% done, estimate finish Fri Apr 29 18:43:26 2005
 44.26% done, estimate finish Fri Apr 29 18:43:26 2005
 44.49% done, estimate finish Fri Apr 29 18:43:27 2005
 44.72% done, estimate finish Fri Apr 29 18:43:27 2005
 44.95% done, estimate finish Fri Apr 29 18:43:27 2005
 45.18% done, estimate finish Fri Apr 29 18:43:25 2005
 45.41% done, estimate finish Fri Apr 29 18:43:25 2005
 45.64% done, estimate finish Fri Apr 29 18:43:26 2005
 45.87% done, estimate finish Fri Apr 29 18:43:26 2005
 46.10% done, estimate finish Fri Apr 29 18:43:26 2005
 46.33% done, estimate finish Fri Apr 29 18:43:26 2005
 46.56% done, estimate finish Fri Apr 29 18:43:24 2005
 46.79% done, estimate finish Fri Apr 29 18:43:24 2005
 47.02% done, estimate finish Fri Apr 29 18:43:25 2005
 47.25% done, estimate finish Fri Apr 29 18:43:25 2005
 47.49% done, estimate finish Fri Apr 29 18:43:25 2005
 47.72% done, estimate finish Fri Apr 29 18:43:25 2005
 47.95% done, estimate finish Fri Apr 29 18:43:25 2005
 48.18% done, estimate finish Fri Apr 29 18:43:24 2005
 48.41% done, estimate finish Fri Apr 29 18:43:24 2005
 48.64% done, estimate finish Fri Apr 29 18:43:24 2005
 48.87% done, estimate finish Fri Apr 29 18:43:24 2005
 49.10% done, estimate finish Fri Apr 29 18:43:24 2005
 49.33% done, estimate finish Fri Apr 29 18:43:25 2005
 49.56% done, estimate finish Fri Apr 29 18:43:23 2005
 49.79% done, estimate finish Fri Apr 29 18:43:23 2005
 50.02% done, estimate finish Fri Apr 29 18:43:23 2005
 50.25% done, estimate finish Fri Apr 29 18:43:23 2005
 50.48% done, estimate finish Fri Apr 29 18:43:24 2005
 50.71% done, estimate finish Fri Apr 29 18:43:24 2005
 50.94% done, estimate finish Fri Apr 29 18:43:24 2005
 51.17% done, estimate finish Fri Apr 29 18:43:22 2005
 51.40% done, estimate finish Fri Apr 29 18:43:22 2005
 51.63% done, estimate finish Fri Apr 29 18:43:23 2005
 51.87% done, estimate finish Fri Apr 29 18:43:23 2005
 52.10% done, estimate finish Fri Apr 29 18:43:23 2005
 52.33% done, estimate finish Fri Apr 29 18:43:23 2005
 52.56% done, estimate finish Fri Apr 29 18:43:23 2005
 52.79% done, estimate finish Fri Apr 29 18:43:22 2005
 53.02% done, estimate finish Fri Apr 29 18:43:22 2005
 53.25% done, estimate finish Fri Apr 29 18:43:22 2005
 53.48% done, estimate finish Fri Apr 29 18:43:22 2005
 53.71% done, estimate finish Fri Apr 29 18:43:22 2005
 53.94% done, estimate finish Fri Apr 29 18:43:23 2005
 54.17% done, estimate finish Fri Apr 29 18:43:21 2005
 54.40% done, estimate finish Fri Apr 29 18:43:21 2005
 54.63% done, estimate finish Fri Apr 29 18:43:21 2005
 54.86% done, estimate finish Fri Apr 29 18:43:22 2005
 55.09% done, estimate finish Fri Apr 29 18:43:22 2005
 55.32% done, estimate finish Fri Apr 29 18:43:22 2005
 55.55% done, estimate finish Fri Apr 29 18:43:22 2005
 55.78% done, estimate finish Fri Apr 29 18:43:21 2005
 56.01% done, estimate finish Fri Apr 29 18:43:21 2005
 56.25% done, estimate finish Fri Apr 29 18:43:21 2005
 56.48% done, estimate finish Fri Apr 29 18:43:21 2005
 56.71% done, estimate finish Fri Apr 29 18:43:21 2005
 56.94% done, estimate finish Fri Apr 29 18:43:21 2005
 57.17% done, estimate finish Fri Apr 29 18:43:20 2005
 57.40% done, estimate finish Fri Apr 29 18:43:20 2005
 57.63% done, estimate finish Fri Apr 29 18:43:20 2005
 57.86% done, estimate finish Fri Apr 29 18:43:20 2005
 58.09% done, estimate finish Fri Apr 29 18:43:21 2005
 58.32% done, estimate finish Fri Apr 29 18:43:21 2005
 58.55% done, estimate finish Fri Apr 29 18:43:21 2005
 58.78% done, estimate finish Fri Apr 29 18:43:20 2005
 59.01% done, estimate finish Fri Apr 29 18:43:20 2005
 59.24% done, estimate finish Fri Apr 29 18:43:20 2005
 59.47% done, estimate finish Fri Apr 29 18:43:20 2005
 59.70% done, estimate finish Fri Apr 29 18:43:20 2005
 59.93% done, estimate finish Fri Apr 29 18:43:20 2005
 60.16% done, estimate finish Fri Apr 29 18:43:19 2005
 60.39% done, estimate finish Fri Apr 29 18:43:19 2005
 60.62% done, estimate finish Fri Apr 29 18:43:19 2005
 60.85% done, estimate finish Fri Apr 29 18:43:19 2005
 61.09% done, estimate finish Fri Apr 29 18:43:20 2005
 61.32% done, estimate finish Fri Apr 29 18:43:20 2005
 61.55% done, estimate finish Fri Apr 29 18:43:20 2005
 61.78% done, estimate finish Fri Apr 29 18:43:19 2005
 62.01% done, estimate finish Fri Apr 29 18:43:19 2005
 62.24% done, estimate finish Fri Apr 29 18:43:19 2005
 62.47% done, estimate finish Fri Apr 29 18:43:19 2005
 62.70% done, estimate finish Fri Apr 29 18:43:19 2005
 62.93% done, estimate finish Fri Apr 29 18:43:19 2005
 63.16% done, estimate finish Fri Apr 29 18:43:18 2005
 63.39% done, estimate finish Fri Apr 29 18:43:18 2005
 63.62% done, estimate finish Fri Apr 29 18:43:18 2005
 63.85% done, estimate finish Fri Apr 29 18:43:19 2005
 64.08% done, estimate finish Fri Apr 29 18:43:19 2005
 64.31% done, estimate finish Fri Apr 29 18:43:19 2005
 64.54% done, estimate finish Fri Apr 29 18:43:19 2005
 64.77% done, estimate finish Fri Apr 29 18:43:18 2005
 65.00% done, estimate finish Fri Apr 29 18:43:18 2005
 65.23% done, estimate finish Fri Apr 29 18:43:18 2005
 65.46% done, estimate finish Fri Apr 29 18:43:18 2005
 65.70% done, estimate finish Fri Apr 29 18:43:18 2005
 65.93% done, estimate finish Fri Apr 29 18:43:19 2005
 66.16% done, estimate finish Fri Apr 29 18:43:19 2005
 66.39% done, estimate finish Fri Apr 29 18:43:17 2005
 66.62% done, estimate finish Fri Apr 29 18:43:18 2005
 66.85% done, estimate finish Fri Apr 29 18:43:18 2005
 67.08% done, estimate finish Fri Apr 29 18:43:18 2005
 67.31% done, estimate finish Fri Apr 29 18:43:18 2005
 67.54% done, estimate finish Fri Apr 29 18:43:18 2005
 67.77% done, estimate finish Fri Apr 29 18:43:17 2005
 68.00% done, estimate finish Fri Apr 29 18:43:17 2005
 68.23% done, estimate finish Fri Apr 29 18:43:17 2005
 68.46% done, estimate finish Fri Apr 29 18:43:17 2005
 68.69% done, estimate finish Fri Apr 29 18:43:18 2005
 68.92% done, estimate finish Fri Apr 29 18:43:18 2005
 69.15% done, estimate finish Fri Apr 29 18:43:18 2005
 69.38% done, estimate finish Fri Apr 29 18:43:17 2005
 69.61% done, estimate finish Fri Apr 29 18:43:17 2005
 69.85% done, estimate finish Fri Apr 29 18:43:17 2005
 70.08% done, estimate finish Fri Apr 29 18:43:17 2005
 70.31% done, estimate finish Fri Apr 29 18:43:17 2005
 70.54% done, estimate finish Fri Apr 29 18:43:18 2005
 70.77% done, estimate finish Fri Apr 29 18:43:16 2005
 71.00% done, estimate finish Fri Apr 29 18:43:16 2005
 71.23% done, estimate finish Fri Apr 29 18:43:17 2005
 71.46% done, estimate finish Fri Apr 29 18:43:17 2005
 71.69% done, estimate finish Fri Apr 29 18:43:17 2005
 71.92% done, estimate finish Fri Apr 29 18:43:17 2005
 72.15% done, estimate finish Fri Apr 29 18:43:17 2005
 72.38% done, estimate finish Fri Apr 29 18:43:16 2005
 72.61% done, estimate finish Fri Apr 29 18:43:16 2005
 72.84% done, estimate finish Fri Apr 29 18:43:16 2005
 73.07% done, estimate finish Fri Apr 29 18:43:16 2005
 73.30% done, estimate finish Fri Apr 29 18:43:17 2005
 73.53% done, estimate finish Fri Apr 29 18:43:17 2005
 73.76% done, estimate finish Fri Apr 29 18:43:16 2005
 73.99% done, estimate finish Fri Apr 29 18:43:16 2005
 74.23% done, estimate finish Fri Apr 29 18:43:16 2005
 74.46% done, estimate finish Fri Apr 29 18:43:16 2005
 74.69% done, estimate finish Fri Apr 29 18:43:16 2005
 74.92% done, estimate finish Fri Apr 29 18:43:16 2005
 75.15% done, estimate finish Fri Apr 29 18:43:17 2005
 75.38% done, estimate finish Fri Apr 29 18:43:15 2005
 75.61% done, estimate finish Fri Apr 29 18:43:16 2005
 75.84% done, estimate finish Fri Apr 29 18:43:16 2005
 76.07% done, estimate finish Fri Apr 29 18:43:16 2005
 76.30% done, estimate finish Fri Apr 29 18:43:16 2005
 76.53% done, estimate finish Fri Apr 29 18:43:16 2005
 76.76% done, estimate finish Fri Apr 29 18:43:15 2005
 76.99% done, estimate finish Fri Apr 29 18:43:15 2005
 77.22% done, estimate finish Fri Apr 29 18:43:15 2005
 77.45% done, estimate finish Fri Apr 29 18:43:15 2005
 77.68% done, estimate finish Fri Apr 29 18:43:16 2005
 77.91% done, estimate finish Fri Apr 29 18:43:16 2005
 78.14% done, estimate finish Fri Apr 29 18:43:16 2005
 78.37% done, estimate finish Fri Apr 29 18:43:15 2005
 78.60% done, estimate finish Fri Apr 29 18:43:15 2005
 78.84% done, estimate finish Fri Apr 29 18:43:15 2005
 79.07% done, estimate finish Fri Apr 29 18:43:15 2005
 79.30% done, estimate finish Fri Apr 29 18:43:15 2005
 79.53% done, estimate finish Fri Apr 29 18:43:16 2005
 79.76% done, estimate finish Fri Apr 29 18:43:16 2005
 79.99% done, estimate finish Fri Apr 29 18:43:15 2005
 80.22% done, estimate finish Fri Apr 29 18:43:15 2005
 80.45% done, estimate finish Fri Apr 29 18:43:15 2005
 80.68% done, estimate finish Fri Apr 29 18:43:15 2005
 80.91% done, estimate finish Fri Apr 29 18:43:15 2005
 81.14% done, estimate finish Fri Apr 29 18:43:15 2005
 81.37% done, estimate finish Fri Apr 29 18:43:14 2005
 81.60% done, estimate finish Fri Apr 29 18:43:14 2005
 81.83% done, estimate finish Fri Apr 29 18:43:15 2005
 82.06% done, estimate finish Fri Apr 29 18:43:15 2005
 82.29% done, estimate finish Fri Apr 29 18:43:15 2005
 82.52% done, estimate finish Fri Apr 29 18:43:15 2005
 82.75% done, estimate finish Fri Apr 29 18:43:15 2005
 82.98% done, estimate finish Fri Apr 29 18:43:14 2005
 83.21% done, estimate finish Fri Apr 29 18:43:14 2005
 83.45% done, estimate finish Fri Apr 29 18:43:14 2005
 83.68% done, estimate finish Fri Apr 29 18:43:15 2005
 83.91% done, estimate finish Fri Apr 29 18:43:15 2005
 84.14% done, estimate finish Fri Apr 29 18:43:15 2005
 84.37% done, estimate finish Fri Apr 29 18:43:14 2005
 84.60% done, estimate finish Fri Apr 29 18:43:14 2005
 84.83% done, estimate finish Fri Apr 29 18:43:14 2005
 85.06% done, estimate finish Fri Apr 29 18:43:14 2005
 85.29% done, estimate finish Fri Apr 29 18:43:14 2005
 85.52% done, estimate finish Fri Apr 29 18:43:15 2005
 85.75% done, estimate finish Fri Apr 29 18:43:15 2005
 85.98% done, estimate finish Fri Apr 29 18:43:14 2005
 86.21% done, estimate finish Fri Apr 29 18:43:14 2005
 86.44% done, estimate finish Fri Apr 29 18:43:14 2005
 86.67% done, estimate finish Fri Apr 29 18:43:14 2005
 86.90% done, estimate finish Fri Apr 29 18:43:14 2005
 87.13% done, estimate finish Fri Apr 29 18:43:14 2005
 87.36% done, estimate finish Fri Apr 29 18:43:13 2005
 87.59% done, estimate finish Fri Apr 29 18:43:13 2005
 87.83% done, estimate finish Fri Apr 29 18:43:14 2005
 88.06% done, estimate finish Fri Apr 29 18:43:14 2005
 88.29% done, estimate finish Fri Apr 29 18:43:14 2005
 88.52% done, estimate finish Fri Apr 29 18:43:14 2005
 88.75% done, estimate finish Fri Apr 29 18:43:14 2005
 88.98% done, estimate finish Fri Apr 29 18:43:13 2005
 89.21% done, estimate finish Fri Apr 29 18:43:13 2005
 89.44% done, estimate finish Fri Apr 29 18:43:13 2005
 89.67% done, estimate finish Fri Apr 29 18:43:14 2005
 89.90% done, estimate finish Fri Apr 29 18:43:14 2005
 90.13% done, estimate finish Fri Apr 29 18:43:14 2005
 90.36% done, estimate finish Fri Apr 29 18:43:13 2005
 90.59% done, estimate finish Fri Apr 29 18:43:13 2005
 90.82% done, estimate finish Fri Apr 29 18:43:13 2005
 91.05% done, estimate finish Fri Apr 29 18:43:13 2005
 91.28% done, estimate finish Fri Apr 29 18:43:13 2005
 91.51% done, estimate finish Fri Apr 29 18:43:14 2005
 91.74% done, estimate finish Fri Apr 29 18:43:14 2005
 91.97% done, estimate finish Fri Apr 29 18:43:13 2005
 92.20% done, estimate finish Fri Apr 29 18:43:13 2005
 92.44% done, estimate finish Fri Apr 29 18:43:13 2005
 92.67% done, estimate finish Fri Apr 29 18:43:13 2005
 92.90% done, estimate finish Fri Apr 29 18:43:13 2005
 93.13% done, estimate finish Fri Apr 29 18:43:13 2005
 93.36% done, estimate finish Fri Apr 29 18:43:13 2005
 93.59% done, estimate finish Fri Apr 29 18:43:13 2005
 93.82% done, estimate finish Fri Apr 29 18:43:13 2005
 94.05% done, estimate finish Fri Apr 29 18:43:13 2005
 94.28% done, estimate finish Fri Apr 29 18:43:13 2005
 94.51% done, estimate finish Fri Apr 29 18:43:13 2005
 94.74% done, estimate finish Fri Apr 29 18:43:13 2005
 94.97% done, estimate finish Fri Apr 29 18:43:12 2005
 95.20% done, estimate finish Fri Apr 29 18:43:13 2005
 95.43% done, estimate finish Fri Apr 29 18:43:13 2005
 95.66% done, estimate finish Fri Apr 29 18:43:13 2005
 95.89% done, estimate finish Fri Apr 29 18:43:13 2005
 96.12% done, estimate finish Fri Apr 29 18:43:13 2005
 96.35% done, estimate finish Fri Apr 29 18:43:13 2005
 96.58% done, estimate finish Fri Apr 29 18:43:12 2005
 96.81% done, estimate finish Fri Apr 29 18:43:12 2005
 97.05% done, estimate finish Fri Apr 29 18:43:13 2005
 97.28% done, estimate finish Fri Apr 29 18:43:13 2005
 97.51% done, estimate finish Fri Apr 29 18:43:13 2005
 97.74% done, estimate finish Fri Apr 29 18:43:13 2005
 97.97% done, estimate finish Fri Apr 29 18:43:12 2005
 98.20% done, estimate finish Fri Apr 29 18:43:12 2005
 98.43% done, estimate finish Fri Apr 29 18:43:12 2005
 98.66% done, estimate finish Fri Apr 29 18:43:12 2005
 98.89% done, estimate finish Fri Apr 29 18:43:13 2005
 99.12% done, estimate finish Fri Apr 29 18:43:13 2005
 99.35% done, estimate finish Fri Apr 29 18:43:13 2005
 99.58% done, estimate finish Fri Apr 29 18:43:12 2005
 99.81% done, estimate finish Fri Apr 29 18:43:12 2005
Total translation table size: 0
Total rockridge attributes bytes: 1794
Total directory bytes: 4096
Path table size(bytes): 42
Max brk space used 21000
2169098 extents written (4236 MB)
builtin_dd: 2169104*2KB out @ average 3.9x1385KBps
/dev/scd1: flushing cache
/dev/scd1: updating RMA
/dev/scd1: closing session
:-[ CLOSE SESSION failed with SK=5h/ASC=72h/ACQ=03h]: Input/output error
/dev/scd1: reloading tray

---end---

After that the drive became pretty much unuseable until I turned it off and back on. So here's dvd+rw-mediainfo after that:

---start---

$ dvd+rw-mediainfo /dev/scd1
INQUIRY:                [HL-DT-ST][DVDRAM GSA-4160B][A302]
GET [CURRENT] CONFIGURATION:
 Mounted Media:         11h, DVD-R Sequential
 Media ID:              RITEKG04    
 Current Write Speed:   4.0x1385=5540KB/s
 Write Speed #0:        4.0x1385=5540KB/s
 Write Speed #1:        2.0x1385=2770KB/s
GET [CURRENT] PERFORMANCE:
 Write Performance:     4.0x1385=5540KB/s@[0 -> 2298495]
 Speed Descriptor#0:    02/2298495 R@4.1x1385=5730KB/s W@4.0x1385=5540KB/s
 Speed Descriptor#1:    02/2298495 R@4.1x1385=5730KB/s W@2.0x1385=2770KB/s
READ DVD STRUCTURE[#0h]:
 Media Book Type:       25h, DVD-R book [revision 5]
 Legacy lead-out at:    2298496*2KB=4707319808
READ DISC INFORMATION:
 Disc status:           appendable
 Number of Sessions:    1
 State of Last Session: incomplete
 "Next" Track:          1
 Number of Tracks:      1
READ TRACK INFORMATION[#1]:
 Track State:           complete incremental,damaged
 Track Start Address:   0*2KB
 Free Blocks:           128768*2KB
 Track Size:            2297888*2KB
 Last Recorded Address: 2169103*2KB
READ CAPACITY:          1*2048=2048

---end---

I didn't know if there was any logs that could provide more info, so, if there is, please let me know and I will post it/them too. This was the output for the second recording that failed, but the first one was exactly the same.
One more thing: I found a couple of posts from people who had this problem on freebsd and were able not to loose the disks by fixating them with burncd. Is there any way that I can try that?
Thanks in advance for any help.

Tiago Urameshi



Reply to: