Re: timeline for 5.0.4+edu1 in mid March 2010



Hi,

this is an update on the timeline to release 5.0.4+edu1 and a request for 
writing a press release about it.

On Donnerstag, 11. März 2010, Holger Levsen wrote:
> > the following has been done:
> > > - Send out a call for translations of d-e-install NOW - we dont have
> > > any string changes planned, right?
> > >
> > > - commits to trunk need to be suited for lenny(-test). If that is not
> > > possible, either commit the patch to the Debian bts or copy the last
> > > tag which is in our lenny to branches/lenny/$package and then commit to
> > > trunk. Putting the patch in the BTS is prefered, as else trunk and
> > > branch need to be kept in sync.
> > >
> > > - NEW packages for lenny-test must be in squeeze (with whatever
> > > version).
> > >
> > > - To move a package to lenny, the same version must be in sid at least.
> >
> > debian-edu-config, debian-edu-install and shutdown-at-night have newer
> > versions in our lenny-test than in sid. Please upload newer versions to
> > sid, I suggest to use non ~svn versions and also upload to lenny-test.
>
> This has happened as well.
>
> > > - At freeze time the packages will be moved from lenny-test to lenny,
> > > after that only fixes for bug of priority 1 and regressions compared to
> > > 5.0.4+edu0 are acceptable.
>
> I expect to do this (^) tomorrow.
>
> > This will probably happen on the 4th or 5th of march only:
> > > - Release rc1 and start drafting the international press announcement
> > > on the 3th.

Everything above has happened now, rc1 is available.

> I now plan to release rc1 and start drafting the international press
> announcement on saturday, the 13th.

This should be done now, I suggest to use 
http://wiki.debian.org/DebianEdu/PressReleases/5.0.4+edu1 

> Current estimates: if issues are found in rc1 (but not in rc2..), the 24th
> is the last upload day for d-e-i and d-e-d for new translations, final
> release on the 26th.

This estimate/plan is still valid, the release wont be done until the press 
release is finished (though).

> And the following after that:
> > > - Party.
> > >
> > > - Release of national and local press releases.
> > >
> > > - More party!
> > >
> > > - Maintainance mode after edu1 means: updates to the documentation and
> > > its translations (via the d-e-doc package), security fixes, mostly via
> > > Debian, important bugfixes if non-intrusive, mostly via Debian. make a
> > > 5.0.X+edu2 release if needed.
> >
> > As said:
> > > - This timeline is a guideline, which we aim to match. We release when
> > > everything is ready.
>
> * Emphasize the last paragraph�*
>
>
> cheers,
> 	Holger


Attachment: signature.asc
Description: This is a digitally signed message part.


Reply to: