Re: Phase 1 of Li18nux integration into the LSB



Since the Li18nux tests already use the TET/VSXgen subset approach
that we use for LSB testing,
the first step is to produce just the SRC/subset addon and the
appropriate tset tree (and any needed SRC/common stuff) for the 9
interfaces. That should be relatively straightforward and not take
too long (~1 hour or less).

We need to add those to a new branch of the tree targeted for LSB v1.3
(are the interfaces new or are they already in LSB? If already in,
we could add them to the 1.2 branch for increased coverage).

Then we will need to run them thru a pilot.

regards
Andrew

On Sep 17,  3:37pm in "Phase 1 of Li18nux i", George Kraft IV wrote:
> To complete phase 1 of Li18nux integration into the LSB we need to bring over
> some of the TET test cases.  We need to isolate the Li18nux tests pertinent to
> LSB v1.3 with the nine new interfaces, then get them built and packaged up in
> the LSB runtime tests.
> 
> Who in Li18nux can help?
> 
> https://sourceforge.net/pm/task.php?func=detailtask&project_task_id=57717&group_id=1107&group_project_id=8267
> 
> George (gk4)
> 
> 
> -- 
> To UNSUBSCRIBE, email to lsb-test-request@lists.linuxbase.org
> with subject of "unsubscribe". Trouble? Email listmaster@lists.linuxbase.org
>-- End of excerpt from George Kraft IV