On 02/08/2018 07:01 PM, László Böszörményi (GCS) wrote:
It's already packaged[1] and uploaded. Every new package (source or binary) needs FTP Master approval first. It needs their time, I don't know when it will happen. Hopefully soon, I'm waiting for a month already.
I'm not sure if linking with OpenSSL is still a problem (from license standpoint). The last Botan wasn't linked with OpenSSL because of license.
Thank you for packaging. :D - Adam