Re: 11.7 planning
If you want my help with testing i can do the later April dates 15th,
22nd and 29th
On 3/15/23, Jonathan Wiltshire <jmw@debian.org> wrote:
> Hi,
>
> We're overdue for 11.7 and need it done with a keyring update included
> before bookworm can be released. The wheels are turning on the keyring so
> how do dates in April look for everybody? Saturdays are 1st (probably too
> soon), 8th, 15th, 22nd and 29th.
>
> Thanks,
>
> --
> Jonathan Wiltshire jmw@debian.org
> Debian Developer http://people.debian.org/~jmw
>
> 4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC 74C3 5394 479D D352 4C51
> ed25519/0x196418AAEB74C8A1: CA619D65A72A7BADFC96D280196418AAEB74C8A1
>
>