[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

Bug#827061: marked as done (transition: openssl)



Your message dated Sun, 25 Jun 2017 22:36:52 +0200
with message-id <768dfc0c-d77e-b15f-8e88-ddd2cbd1e8b6@debian.org>
and subject line Re: Bug#827061: transition: openssl
has caused the Debian Bug report #827061,
regarding transition: openssl
to be marked as done.

This means that you claim that the problem has been dealt with.
If this is not the case it is now your responsibility to reopen the
Bug report if necessary, and/or fix the problem forthwith.

(NB: If you are a system administrator and have no idea what this
message is talking about, this may indicate a serious mail system
misconfiguration somewhere. Please contact owner@bugs.debian.org
immediately.)


-- 
827061: http://bugs.debian.org/cgi-bin/bugreport.cgi?bug=827061
Debian Bug Tracking System
Contact owner@bugs.debian.org with problems
--- Begin Message ---
Package: release.debian.org
Severity: normal
User: release.debian.org@packages.debian.org
Usertags: transition

Hi,

OpenSSL will soon release a new upstream version with a new
soname.  This new version will break various packages, see:
https://lists.debian.org/debian-devel/2016/06/msg00205.html

I'm currently not sure when the release will be ready.  I would
like to start this transition as soon as possible, but probably
after it's actually released.  I don't expect this to take long.

If I'm ready to upload it to unstable, can I start this
transition?  Are there things you want me to do?


Kurt

--- End Message ---
--- Begin Message ---
On 11/06/16 20:59, Kurt Roeckx wrote:
> Package: release.debian.org
> Severity: normal
> User: release.debian.org@packages.debian.org
> Usertags: transition
> 
> Hi,
> 
> OpenSSL will soon release a new upstream version with a new
> soname.  This new version will break various packages, see:
> https://lists.debian.org/debian-devel/2016/06/msg00205.html
> 
> I'm currently not sure when the release will be ready.  I would
> like to start this transition as soon as possible, but probably
> after it's actually released.  I don't expect this to take long.
> 
> If I'm ready to upload it to unstable, can I start this
> transition?  Are there things you want me to do?

This happened for stretch and we shipped both 1.0 and 1.1. Let's close this bug
as it's already too long and open a new one to remove 1.0 from buster.

Cheers,
Emilio

--- End Message ---

Reply to: