Thomas Pierson <contact@thomaspierson.fr> (22/05/2012): > I have been notified that Clementine takes part of the boost1.49 > transition.[1] > > I have some bugs fixes which are pending for an upload and one of them > is an rc bug. > > So I would like to ask you which time I need to plan before I can do a > new upload for Clementine? Maybe that this is already possible? The boost transition is a bit special; the bottom line is: don't worry about it, upload your package as you see fit. Thanks for checking with us anyway. Mraw, KiBi.
Attachment:
signature.asc
Description: Digital signature