Hi Adeodato, On Saturday 29 November 2008, Adeodato Simó wrote: > Ok, done. unstable has +b3 at the moment, I've scheduled +b5 to > leave +b4 free for use in testing, should we need it. Thanks. > > And a related question: Since 2.2.9-11 is blocked from migration > > by libpcre3, would you accept a t-p-u upload with the changes > > from 2.2.9-11? It fixes two possible segfaults, but ATM I don't > > know how often they occur. Here is the changelog: > So, these fixes come from upstream's svn, to be included in the > next 2.2.x point release? If that's the case, you may upload to > t-p-u, and I'll migrate it to testing after apache2 has aged in > unstable a bit without problems. Yes, both fixes will be in 2.2.11. I have uploaded 2.2.9-10+lenny1 to t-p-u. > (Also, FYI, there will be a bit period of time where > apache2-mpm-itk will be uninstallable in testing, the time between > apache2 entering testing and the buildds binNMUing it against > testing.) CCing Steinar for this info. Cheers, Stefan
Attachment:
signature.asc
Description: This is a digitally signed message part.