Hello there! I am the maintainer of trac and i pretend to ship trac 0.11 with lenny. Meanwhile, i need to upload a bug fixing (some small bugs) release and wait it to be accepted for release, but i first need trac 0.11 to go into testing. Trac-ja-resource is preventing the migration of trac into testing. The new trac package closes at least 1 RC bug. thanks Luis matos