Re: lilypond plans
On Thu, Nov 16, 2006 at 07:05:01PM -0800, Thomas Bushnell BSG wrote:
> Currently lilypond 2.8.7 is in unstable. It is blocked waiting for its
> own timelimit and for guile-1.8 to finish building on other archs and
> migrate itself.
>
If you want to get a 2.8.* release in, wait. If Etch is released
with 2.8.7, will that do?
> There is one more release in the 2.8 cycle, 2.8.8, which I have not
> packaged.
What, if anything would packaging 2.8.8 do for us that 2.8.7 doesn't?
>
> Also, there is now 2.10.0, which I have packaged, but not uploaded.
>
Potentially, upload 2.8.8 to unstable and mark as "not for Etch" for the
moment: then work on 2.10.0?
> I wonder what is the best thing for me to do. Most important to me is
> to get 2.8 into testing, though this may well be impossible. Should I
> upload 2.10.0?
>
> Thomas
>
Reply to: