Re: status update of ocaml 3.06 testing transition.
On Sat, Oct 26, 2002 at 10:21:38AM +0200, Sven Luther wrote:
> Hello, ...
>
> Current situation of the ocaml 3.06 testing migration is :
>
> o ocaml 3.06-7 is out of date on arm and mipsel.
=> 3.06-11 is now built on all arches.
> o postgreSQL has still an open Grave bug on sparc :
>
> #165060: postgresql: int8 value out of range on sparc
=> This was fixed by 7.2.3-2 yesterday.
Now, postgresql needs to be built on all arches, and wait for 2 days
at it has priority high. This means that monday ocaml 3.06 could move
into testing, it will be a bit later though for all autobuilders to
catch up.
> o wlex is out of date on arm, pxp is out of date on mipsel and s390.
=> Both of these packages have been built for all arches, and have
waited for enough days, and are thus ready to enter testing.
> Unless there is another issue i did miss naturally.
Did not check for another issue.
> I thus think we should have a mini-freeze this next week, at least for
> stuff that is already in testing, and if all goes well, ocaml 3.06 will
> enter testing next sunday or the monday after it.
Well, i was almost right on this schedule. Now let's just wait for the
autobuilders.
Once that is done, i will prepare a ocaml with moved libdir, bump the
virtual dependency, and you can all rebuild with it.
I much prefer 3.06.1 as dependency, but this could also be 3.06+1 or
3.06a or some other scheme. I don't think it is really astute that we
use 3.06-11 for this, altough if you all think it is best, i will do it.
Friendly,
Sven Luther
Reply to: