Re: Closing WNPP ITP
Hi Antti-Juhani!
On Sun, 24 Sep 2000, Antti-Juhani Kaijanaho wrote:
> On 20000924T183823+0200, Peter Palfrader wrote:
> > I can see one problem with omiting #3. If someone else posts the ITP (or
> > RFP or whatever) and you close the bug without reassigning it to your
> > package, then it will only get marked as done and not closed.
>
> There is no difference between marking a bug done and closing a bug -
> they are two different names for the same thing.
>
> Indeed, but that's just a convention. The BTS does not enforce it.
Hmm. I always thought there was a difference. After checking the docs it
seems I confused something with NMUs and closing bugs[1].
Thanks for making this clear.
References:
1. 7.4.3 Source NMUs and the Bug Tracking System
http://www.debian.org/doc/packaging-manuals/developers-reference/ch-nmu.html#s-nmu-patch
--
Peter