[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

Re: following or getting ahead of Stable



On 12/12/2024 11:42, Sean Whitton wrote:
Hello,

On Thu 12 Dec 2024 at 02:33am +02, Adrian Bunk wrote:

Would it be possible to setup bullseye in the ELTS infrastructure for
low-priority updates right now, the same way jessie, stretch and buster
are already there?

The simplest setup would be that contributors upload there, and the
batch-release would consist of someone at Freexian manually uploading
the already signed source packages from there to LTS.

More fancy would be a working migrate command that migrates to LTS.

Announcement texts for the next low-priority batch-release could be
stored in git or some wiki.

As a bonus, this could also give us autopkgtest testing for triggered
packages. If that's available, I would even upload high-priority fixes
there first for getting the test results.

Around the same time we got our 'dcut migrate' for ELTS, there was mail
from someone on the wanna-build team (I think?) about implementing
something similar for security-master.  Probably we should follow up on
that effort before looking into extending ELTS infrastructure.

I implemented it in dak, but it's not been set up on security-master yet.

Emilio


Reply to: