[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

Re: Scheduling 9.5



On Fri, 2018-06-08 at 18:51 +0100, Adam D. Barratt wrote:
> We can either accept the packages and put up with the situation for a
> short while, or do 9.5 before 8.11. In practical terms, that would
> likely mean both 9.5 and 8.11 on June 23rd, freezing both next
> weekend.

Should be fine with me; Joerg wanted to do the 8.11 one, but if he has
time restrictions on June 23rd and doing 8.11 after 9.5 would be too
late for him, I could probably also do both.

(If Joerg wants to do both, that's also fine with me.)

Ansgar


Reply to: