Hello, I would like to get on with the preparations of 2.6.15-rc7 and schedule an upload to experimental for tomorrow evening UTC. The following architectures need their configs still to be updated: alpha hppa m68k s390 Anyone objecting against this schedule? It still would be great to have 2.6.15-final uploaded and working on all architectures the same day upstream releases. Best regards Frederik Schueler -- ENOSIG
Attachment:
signature.asc
Description: Digital signature