[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

Power tests at ETH (affects rossini.d.n and strauss.d.n only) 29th Nov. (today) and on 20th Dec. 2012



Hi,

there will be two power system tests which will cause power
interruptions in the building where hurd.ethz.ch resides.

hurd.ethz.ch hosts the Xen guests rossini.debian.net (an hurd buildd
AFAIK, _not_ rossini.debian.*org*) and strauss.debian.net (an hurd
porterbox).

The first power interruption will be a short one (a few minutes), as
they're testing the residual-current devices (RCD). It will happen
this late afternoon between 17:00 and 18:00 CET (GMT +0100, i.e. 16:00
and 17:00 UTC).

The second power interruption will be a test of the isolation and take
longer (15 minutes to several hours, depending on the result). It will
happen on 20th of December 2012. Exact time yet to be determined.

		Regards, Axel
-- 
 ,''`.  |  Axel Beckert <abe@debian.org>, http://people.debian.org/~abe/
: :' :  |  Debian Developer, ftp.ch.debian.org Admin
`. `'   |  1024D: F067 EA27 26B9 C3FC 1486  202E C09E 1D89 9593 0EDE
  `-    |  4096R: 2517 B724 C5F6 CA99 5329  6E61 2FF9 CD59 6126 16B5

Attachment: signature.asc
Description: Digital signature


Reply to: