Re: stretch EOL point release (9.13) and 10.5 planning



Adam D. Barratt <adam@adam-barratt.org.uk> (2020-07-18):
> Now that stretch EoL is (more or less) out of the way, it would be good
> to get 10.5 done as soon as we sensibly can, so as not to slip too far
> off schedule.
> 
> Next weekend is probably a little too soon - I'd at least like to not
> jump straight back into freezing - but how about one of:
> 
> - August 1st/2nd
> - August 8th/9th

Both should work equally for me regarding the installer.