[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

[Maintenance] repo.jing.rocks summer maintenance Aug 10 - Aug 14



-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA256

Dear all,

repo.jing.rocks will have a planned hardware maintenance during the
following time:

- From 2023-08-10T10:00:00 UTC to 2023-08-14T00:00:00 UTC

This planned maintenance will include storage migration and network
reconfiguration.

Sorry for the inconvenience.

-----BEGIN PGP SIGNATURE-----

iHUEARYIAB0WIQR/goV7+wsw122cT21tY70vdeMntAUCZMuktwAKCRBtY70vdeMn
tPXXAQC63iM4fkzW3/rFv8TxBrmbTDClyHabxdEjjGtgGyCqHAEAhTS061Bt9DtC
6U7ESYNWCX3xweqfkXf+MLdHaf7BYgU=
=MKLj
-----END PGP SIGNATURE-----

-- 
Jing Luo
About me: https://jing.rocks/about/
GPG Fingerprint: 4E09 8D19 00AA 3F72 1899 2614 09B3 316E 13A1 1EFC


Reply to: