Please delay the xulrunner transition until the current gcj-4.2 and gcj-4.3 are in testing, or else you couple the move of those packages to testing to the xulrunner transition. At the same time please get rid of the uninstallability issues of xul/iceape with every subsubminor version upgrade as long as the package is not built on every architecture. thanks, Matthias