On Thu, Jul 30, 2009 at 07:28:58PM +0200, Luk Claes wrote: > time-based freezes > ================== > > For the squeeze release (and future releases), we are considering a > time-based freeze, meaning that the freeze will happen at a predictable > and predetermined time with the release happening at a later time once > the release requirements are met. We think that having a time-based The press team are still announcing [1] this as a "decision to adopt the policy of timed release freezes beginning with the next release", while RT maintain that it is under consideration. Which is true? (note: I'm not shooting any messengers, I just want to understand.) 1: http://lists.debian.org/debian-announce/2009/msg00010.html -- Jonathan Wiltshire 1024D: 0xDB800B52 / 4216 F01F DCA9 21AC F3D3 A903 CA6B EA3E DB80 0B52 4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC 74C3 5394 479D D352 4C51
Attachment:
signature.asc
Description: Digital signature