On Sunday 04 March 2007 02:08, Frans Pop wrote:
> Post-Etch development
> =====================
> I think it is time to open the SVN repository again for post-Etch work,
> with the following exceptions:
> - the "packages/partman" directory and everything below it because of
>   the work on the open issues described earlier

As the final partman uploads have now been done, this is now open for 
post-etch development too.

> - the "installer" directory and everything below it
> - the manual as that is currently frozen for a last upload

These are still frozen.