[Date Prev][Date Next] [Thread Prev][Thread Next] [Date Index] [Thread Index]

Re: Notes on IRC meeting



On 16/03/10 at 22:18 +0000, Jurij Smakov wrote:
> On Tue, Mar 16, 2010 at 10:28:58PM +0100, Marc Brockschmidt wrote:
> >  * ruby1.9 -> ruby1.9.1:
> >    - already ongoing (20 packages, half done)
> >    - needs to fix ruby1.9.1/sparc FTBFS (new kernel?)
> >    - HE is tracking it
> 
> Marc, I think we've put sufficient effort into trying to reproduce 
> this sparc failure outside of buildds and failed in all cases. 
> Personally, I'm fine with doing a porter upload for it to move things 
> forward, if the release team is ok with it.

I've already done that a few weeks ago (after asking for permission), to
allow the package to migrate to testing and stop blocking a lot of other
packages. However, it would be better to find a long term solution
(allowing to build the package on the buildds).
-- 
| Lucas Nussbaum
| lucas@lucas-nussbaum.net   http://www.lucas-nussbaum.net/ |
| jabber: lucas@nussbaum.fr             GPG: 1024D/023B3F4F |


Reply to: